Nebulae Solutions LTD.

Home › Bespoke laboratory equipment

Bespoke laboratory equipment

Apparatus designed from the test method backwards: pressure, temperature, materials, measurement and control, then built, commissioned and supported.

  • Autoclaves
  • Rocking cells
  • Wax apparatus
  • Hydrate early warning
  • Calibration and service
4.0 °C Autoclaves and rocking cells

Designed from the test method backwards

Off-the-shelf apparatus is built for general use. When a test has to reproduce specific field conditions, measure something unusual or run unattended for days, it is often better to design the equipment around the method. We start from what must be measured and how accurately, then work back to the hardware.

Design questionWhat it decides
Pressure and temperature envelopeWall thickness, closures, seals, cooling and heating capacity
Fluids, including H2S, CO2 and brinesWetted materials, for example 316L stainless steel or nickel alloys such as Hastelloy C-276 for sour and high-chloride service
What must be observedSapphire windows, cameras, torque or ball-movement sensing
Accuracy and repeatabilitySensor class, calibration, temperature stability, number of parallel cells
How long tests runAutomation, data logging, alarms and safe unattended operation
Who will use itSoftware interface, procedures, training and maintenance access
Safety first. Pressure equipment is designed, built and tested to the applicable pressure equipment requirements, with pressure relief, interlocks and documented hydrotests before it is handed over.

Hydrate autoclaves

A stirred autoclave is the workhorse for hydrate equilibrium, KHI and AA testing. Key design features:

  • Magnetically coupled stirring, so no shaft seal is exposed to the high-pressure gas, with variable speed and torque measurement to detect hydrate formation and slurry viscosity.
  • Jacketed cooling and heating with precise control for ramped cooling, isothermal holds and the small, slow steps needed for isochoric equilibrium measurements.
  • High-accuracy pressure and temperature sensors in the gas and liquid phases.
  • Optional sapphire windows to watch where hydrates form and how they behave.
  • Gas injection and sampling ports for gas uptake measurements and composition checks.

Rocking cells

Hydrate nucleation is random, so a single test proves little. Rocking cell rigs run several small high-pressure cells side by side in one temperature bath, giving statistical confidence and fast comparison of products and doses.

  • Each cell contains a steel ball that rolls as the rig rocks. When hydrates form, the ball slows or stops, giving a direct sign that flow is being lost.
  • Independent pressure and temperature logging in every cell.
  • Adjustable rocking angle and frequency to change the degree of mixing.
  • Suited to KHI ranking, hold-time tests and AA water-cut sweeps, including shut-in and restart sequences.

Wax apparatus

  • Cold finger rigs: a cooled probe in a stirred, warmer oil sample. The mass deposited over time, at controlled temperature difference, ranks wax inhibitors and supports deposition models.
  • Small flow loops: oil pumped through a cooled test section, measuring pressure drop and deposit thickness under realistic shear.
  • WAT and gelling measurement: controlled cooling with viscosity or optical detection, and rheometer set-ups for gel strength and restart pressure.

Hydrate monitoring and early warning

The safest hydrate strategy is one that tells you when the margin is shrinking. Monitoring instruments measure the produced water arriving at the plant or wellhead and work out how well it is protected.

The measurement principle

Electrical conductivity of produced water depends strongly on dissolved salt and less on inhibitor. Acoustic (sound) velocity responds differently to salt and to inhibitors such as methanol, MEG or KHI-carrying solvents. Measuring both, at a known temperature, gives two independent equations in two unknowns, so the salt and inhibitor concentrations can both be calculated. With those, the hydrate equilibrium temperature of the water is known, and so the actual safety margin.

Two measurements, two unknowns

σ = f(S, I, T)   ·   v = g(S, I, T)   ⇒   S, I  ⇒  ΔTmargin

σ conductivity, v acoustic velocity, S salt concentration, I inhibitor concentration, T temperature. Calibration maps for each inhibitor and salt system turn the two readings into concentrations, then into the hydrate margin.

  • At-line or inline installation, depending on sampling access and the speed of answer needed.
  • Alarm limits when the margin falls below an agreed value, and trends that show it falling before it becomes critical.
  • Integration with the control system or process historian so operations see the margin next to injection rates and water production.

Service and calibration

Instruments are only useful while they stay accurate. We install, service and calibrate conductivity–velocity hydrate inhibitor analysers and other laboratory equipment, on site or in the laboratory.

  • Calibration with prepared reference solutions covering the expected salt and inhibitor range.
  • Sensor checks, cleaning and replacement of wear parts.
  • Calibration records and certificates for your quality system.
  • Operator training and troubleshooting support.

Other fit-for-purpose developments

Many requests do not fit a category. Examples of what we can design and build:

High-pressure test cells

Single cells for specific tests, with windows, sampling or special internals.

Sampling systems

Representative sampling of gas, condensate and water from process streams.

Pilot rigs and small flow loops

Scaled tests of a process step before field use.

Automation upgrades

New control, logging and software for existing laboratory equipment.

From requirement to handover

  1. Requirements: the test method, operating envelope, fluids, accuracy and how the equipment will be used.
  2. Design: mechanical, electrical, control and software design with a design review.
  3. Build: fabrication, assembly and wiring with traceable materials and components.
  4. Factory acceptance test: pressure test, functional checks and a trial run of the test method.
  5. Installation and commissioning: on your site, with site acceptance tests.
  6. Training and support: procedures, operator training, calibration and service plans.

Talk to us about bespoke laboratory equipment

Tell us the problem or the question you need answered. We reply to every enquiry.

Email info@nebulaesolutions.com